PBBM suspends ‘EDSA Rebuild’ program

EDSA traffic

MANILA: The scheduled rehabilitation program for the Epifanio delos Santos Avenue (EDSA) will no longer push through on June 13.

KEY TAKEAWAYS

  • When will the EDSA Rebuild program take place?

    The project has been moved to next month.
  • Will the odd-even scheme dry-run in EDSA push through?

    The traffic mitigation measure has also been postponed.
  • This as President Ferdinand Marcos Jr. has just ordered the postponement of the EDSA Rebuild program for a month.

    According to the country’s chief executive, he instructed secretaries Vivencio Dizon and Manuel Bonoan (transportation and public works departments, respectively) to suspend the program after listening to concerns of commuters about the anticipated longer travel time during the EDSA rehabilitation program (which is expected to last for around two years).

    EDSA traffic Photo by Ruben Manahan IV

    Marcos also said that the government will now “find a better way” to ease the plight of commuters.

    Following this, the Metropolitan Manila Development Authority (MMDA) announced that it will also suspend the Odd-even scheme dry run on EDSA.

    Aside from odd-even scheme, the government is eyeing to implement measures for the now-suspended program:

    • Limited access of provincial buses and trucks carrying perishable goods, garbage trucks, and aviation fuel delivery trucks along EDSA
    • Removal of bike lane separators along EDSA and elimination of obstructions along alternate routes
    • Increasing the number of units in EDSA Busway Carousel and MRT-3
    • Toll holiday on select sections of Skyway Stage 3

    Previously, Bonoan shared that the EDSA Rebuild will change the major thoroughfare’s pavement with a sturdy one.

    EDSA traffic Photo by Ruben Manahan IV

    Repair and upgrade will be segmentized and will be done per lane with each portion expected to be completed every two months. The road works will start on the bus lane or innermost lane in both directions until reaching the outer lanes. The stretch of Pasay to Shaw Boulevard (north- and southbound lanes) will be prioritized.

    Also read:

    MMDA to conduct traffic-alleviating measures following EDSA-Kamuning Flyover closure

    Heftier fines vs EDSA Bus Carousel regulation violators to be imposed next week

    PUV drivers to undergo mandatory alcohol, drug testing, says DOTr

    Like and follow us on our social media pages:

    Facebook: https://www.facebook.com/CarmudiPH

    Instagram: https://www.instagram.com/carmudiph/?hl=en

    Tiktok: https://www.tiktok.com/@carmudiph

    Youtube: https://www.youtube.com/@CarmudiPhilippines

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    •  Chevrolet PH launches Groove
      Chevrolet PH launches Groove
      Paulo Papa . Today
    • Penalties for late vehicle registrations, DL renewal waived in calamity-stricken areas
      Penalties for late vehicle registrations, DL renewal waived in calamity-stricken areas
      Ruben Manahan IV . Today
    • Nissan to shut down CIVAC facility in Mexico
      Nissan to shut down CIVAC facility in Mexico
      Ruben Manahan IV . Today
    • Toyota Motor PH creates more conversions for next-gen Tamaraw
      Toyota Motor PH creates more conversions for next-gen Tamaraw
      Ruben Manahan IV . Jul 30, 2025
    • Mazda PH lends out 'dressed-up BT-50' to Pawssion Project
      Mazda PH lends out 'dressed-up BT-50' to Pawssion Project
      Ruben Manahan IV . Jul 30, 2025
    • To conserve and protect: car brands in PH and their conservation projects
      To conserve and protect: car brands in PH and their conservation projects
      Paulo Papa . Jul 29, 2025
    • Check out Toyota GR Yaris’ strengths, weaknesses
      Check out Toyota GR Yaris’ strengths, weaknesses
      Cesar Miguel . Jul 29, 2025
    • Ford Model T: WWI hero
      Ford Model T: WWI hero
      Paulo Papa . Jul 28, 2025
    • Cars, brands with unique wellness features
      Cars, brands with unique wellness features
      Cesar Miguel . Jul 28, 2025
    • Brands that might benefit from the new PH-US trade deal
      Brands that might benefit from the new PH-US trade deal
      Cesar Miguel . Jul 25, 2025
    • Do you still need to wash your car after it rains?
      Do you still need to wash your car after it rains?
      Cesar Miguel . Jun 12, 2025
    • What should you visit first at MIAS 2025?
      What should you visit first at MIAS 2025?
      Cesar Miguel . Apr 11, 2025
    • Do you really need 4x4 for overlanding?
      Do you really need 4x4 for overlanding?
      Cesar Miguel . Mar 26, 2025
    • Number coding 2025: what you need to know
      Number coding 2025: what you need to know
      Paulo Papa . Mar 09, 2025
    • EVs still require lubrication, JAMA execs say
      EVs still require lubrication, JAMA execs say
      Paulo Papa . Mar 09, 2025
    • GWM Cannon: range day
      GWM Cannon: range day
      Paulo Papa . Jul 29, 2025
    • First drive: BYD Sealion 5 DM-i
      First drive: BYD Sealion 5 DM-i
      Cesar Miguel . Jul 21, 2025
    • Honda BR-V S CVT: all about that ‘base’
      Honda BR-V S CVT: all about that ‘base’
      Paulo Papa . Jul 09, 2025
    • Dongfeng Rich 7 4X4 Upper: ideal entry-level truck
      Dongfeng Rich 7 4X4 Upper: ideal entry-level truck
      Paulo Papa . Jul 07, 2025
    • First drive: MG ZS Hybrid+
      First drive: MG ZS Hybrid+
      Cesar Miguel . Jun 30, 2025