NLEX Connector España Section to be completed this year

NLEX Caloocan Interchange

The NLEX Corporation announced that it is eyeing to complete the NLEX Connector España Section within the year.

KEY TAKEAWAYS

  • What is the current status of the NLEX Connector Espana Section's construction?

    The NLEX Corporation said that the five-kilometer section of the NLEX Connector Road is now 70 percent complete.
  • How many motorists are expected to benefit from the project once completed?

    According to the tollway operator, around 35,000 motorists are expected to benefit from the project everyday.
  • In a statement, the tollway operator shared that the five-kilometer España Section of the NLEX Connector Road — situated between Caloocan and España interchanges — is now 70 percent complete and is poised to be completed by the second half of 2022.

    “The NLEX Connector aims to provide the supply chain and logistics sector with a more efficient and truck ban-free route, bypassing busy roads such as EDSA and C5.  It will also enhance accessibility to international airports such as NAIA and Clark, help create jobs, and spur development between Metro Manila and its surrounding provinces in the north and south,” the company explained.

    Once opened, around 35,000 motorists are expected to be served by this new expressway on a daily basis, which runs mostly above the alignment of the Philippine National Railways (PNR).

    NLEX Connector at Blumentritt

    Meanwhile, the NLEX Corporation is eyeing to start the construction of the first two kilometers of the NLEX C5 Link section between the Mindanao Avenue toll plaza and Quirino Highway in Novaliches, Quezon City in the second half of 2022.

    “In its entirety, the NLEX C5 Link is an 11.5-kilometer expressway traversing Mindanao Avenue, Quirino Highway, Regalado Avenue, Congressional Avenue and C.P. Garcia Avenue in Quezon City and a vital portion of the Metro Pacific’s Urban Ring Road or the interconnected tollway network that is being developed to link up the west, east, north, and south sides of Metro Manila. When completed, it is seen to reduce the travel time between Mindanao Avenue and Commonwealth Avenue to 10 minutes instead of the usual 45 minutes,” the toll company said.

    NLEX C5 Link

    Apart from that, the firm said that part of its pipeline of projects for the year is the construction of the third bridge at Candaba Viaduct.

    Once started, the Candaba Third Viaduct project, (expected to be completed in 24 months), will expand the five-kilometer bridge from existing three lanes without shoulder to three lanes with inner and outer shoulder per direction. When completed, the aforementioned section of the road will allow motorists to drive from the then maximum speed of 60kph to 80kph.

    Earlier, NLEX announced other ongoing projects such as the link slab replacement at Candaba Viaduct northbound, the annual NLEX-SCTEX pavement repair program, the strengthening of Pasig-Potrero Bridge, the road raising works at Dinalupihan, the preventive maintenance of its various infrastructure assets, and the continued upgrade of its RFID system. It has also finished working on the link slabs of San Matias Bridge which is located between San Fernando and San Simon interchanges, and the girders of Marilao Interchange Bridge in Marilao, Bulacan.

    “We continue to actively contribute to our country’s economic recovery by ramping up our infrastructure improvements that aim to enhance the mobility and safety of motorists,” NLEX Corporation President J. Luigi Bautisa was quoted as saying.

    Photos from NLEX Corporation

    Also read:

    NLEX Corp. has invested P2.6-B in SCTEX since takeover

    Higher NLEX toll rates to be implemented on May 12

    NLEX Corporation invests P6.9-B in expressway projects

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    • iCAUR V23, V27 available for test drives ahead of PH launch
      iCAUR V23, V27 available for test drives ahead of PH launch
      Ruben Manahan IV . Today
    • OJPH showcases 4 electrified Jaecoo models at Auto Focus Pre-Christmas Test Drive Festival
      OJPH showcases 4 electrified Jaecoo models at Auto Focus Pre-Christmas Test Drive Festival
      Ruben Manahan IV . Today
    • Isuzu PH secures 3rd spot in 2026 PH CXI study
      Isuzu PH secures 3rd spot in 2026 PH CXI study
      Ruben Manahan IV . Nov 13, 2026
    • Toyota adds Tugbok to growing dealership locations in PH
      Toyota adds Tugbok to growing dealership locations in PH
      Ruben Manahan IV . Nov 13, 2026
    • Bentley named Official Partner of Parisian football club
      Bentley named Official Partner of Parisian football club
      Paulo Papa . Nov 13, 2026
    • Check out the most-viewed nameplates on Zigwheels PH
      Check out the most-viewed nameplates on Zigwheels PH
      Paulo Papa . Nov 13, 2026
    • Nameplates that will help move delegates in ASEAN 2026 Summit
      Nameplates that will help move delegates in ASEAN 2026 Summit
      Paulo Papa . Nov 13, 2026
    • VinFast VF8 vs. the competition
      VinFast VF8 vs. the competition
      Cesar Miguel . Nov 12, 2026
    • Chery QEV: initial impressions
      Chery QEV: initial impressions
      Paulo Papa . Nov 10, 2026
    • Is the new Honda City, City Hatchback worth the money?
      Is the new Honda City, City Hatchback worth the money?
      Paulo Papa . Oct 24, 2026
    • Here’s how to protect your paint, upholstery, dash from super El Niño heat
      Here’s how to protect your paint, upholstery, dash from super El Niño heat
      Cesar Miguel . Nov 13, 2026
    • 3 safe driving tips to remember this Undas
      3 safe driving tips to remember this Undas
      Paulo Papa . Nov 01, 2026
    • Getting your car ready for El Niño
      Getting your car ready for El Niño
      Cesar Miguel . Oct 30, 2026
    • Weighing down on car parking
      Weighing down on car parking
      Paulo Papa . Sep 24, 2026
    • Tips on how to prevent vehicle fires
      Tips on how to prevent vehicle fires
      Cesar Miguel . Mar 17, 2026
    • ELECTRIA: Riddara RD6 Econ 73 kWh Long Bed is a huge but comfy daily
      ELECTRIA: Riddara RD6 Econ 73 kWh Long Bed is a huge but comfy daily
      Cesar Miguel . Oct 28, 2026
    • Sedan supremacy: Toyota Corolla Altis GR-S HEV
      Sedan supremacy: Toyota Corolla Altis GR-S HEV
      Paulo Papa . Aug 27, 2026
    • First drive: Kia Sportage Turbo Hybrid
      First drive: Kia Sportage Turbo Hybrid
      Cesar Miguel . Aug 18, 2026
    • First impressions: Geely EX2
      First impressions: Geely EX2
      Cesar Miguel . Jun 18, 2026
    • ELECTRIA: VinFast VF 6 is a well-equipped urban warrior
      ELECTRIA: VinFast VF 6 is a well-equipped urban warrior
      Cesar Miguel . Apr 20, 2026