New SFEX road open until mid-Jan. 2021

SFEX

The Subic Freeport Expressway (SFEX) will be temporarily opened to the public until middle of January next year, so that motorists can use it during the holiday season.

The opening of the new and expanded section of the 8.2-kilometer road project, opened starting today (December 28), was led by Department of Public Works and Highways (DPWH) Secretary Mark Villar along with Subic Bay Metropolitan Authority (SBMA) Chairman and Administrator Wilma Eisma and NLEX Corporation President and General Manager J. Luigi Bautista.

However, the road can only be used December 28, 2020 until January 15, 2021 from 6AM-6PM and will be closed from 6:01PM to 5:59 AM the next day to resume construction.

SFEX

NLEX Corporation stated in their release that a “series of road safety audits showed that the whole project alignment, except for the portion of Jadjad Bridge which is still under construction, has complied with the safety requirements thus safe for use by the motoring public.”

According to Villar, the said road project is now 92-percent complete.

“The project is 92 percent complete. While there are still works to be done in some areas, we are temporarily opening the new road to ease the travel of our motorists this holiday season, especially the truckers and merchants who are delivering essential goods,” Villar said.

It was in late November when Villar mentioned that the project is at 85 percent completion, following their inspection.

Expected to improve traffic flow and road safety, the SFEX road project was made beside the existing SFEX carriageway. Also covered in the P1.6-billion SFEX Capacity Expansion is the conversion of the SFEX to a 2x2 divided expressway, with the construction of two additional expressway lanes, two new bridges, and a new tunnel.

SFEX Capacity Expansion

Aside from that, the expressway will be equipped with expressway-standard LED lights as well as the elevation of Maritan Highway-Rizal Highway-Tipo Road junction together with the enhancement of the drainage system for better flood management in the area.

Serving as connector road to Bataan and Zambales, SFEX Capacity Expansion is envisioned to enhance accessibility and promote travel efficiency and could also bolster Subic’s competitiveness as an ideal shipping gateway for businesses in Central and North Luzon.

“With the improved and expanded SFEX, the transport of goods in and out of the Subic Freeport will be faster and easier. Night driving will also be equally safe and enjoyable for our motorists,” Bautista was quoted as saying.

The SFEX was made after Philippines was chosen to host the APEC Economic Leaders’ Meeting in 1996.

Earlier, the NLEX Corporation announced the rescheduled target completion to the end of this year—an extension of at least three months from its initial schedule set back in 2019.

Photos from NLEX Corporation

Also read:

NLEX to Implement Subic Freeport Expressway Project

SFEX Capacity Expansion Now Underway

NLEX Provides Solutions to Traffic Congestion

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • iCAUR V23, V27 available for test drives ahead of PH launch
    iCAUR V23, V27 available for test drives ahead of PH launch
    Ruben Manahan IV . Nov 14, 2026
  • OJPH showcases 4 electrified Jaecoo models at Auto Focus Pre-Christmas Test Drive Festival
    OJPH showcases 4 electrified Jaecoo models at Auto Focus Pre-Christmas Test Drive Festival
    Ruben Manahan IV . Nov 14, 2026
  • Isuzu PH secures 3rd spot in 2026 PH CXI study
    Isuzu PH secures 3rd spot in 2026 PH CXI study
    Ruben Manahan IV . Nov 13, 2026
  • Toyota adds Tugbok to growing dealership locations in PH
    Toyota adds Tugbok to growing dealership locations in PH
    Ruben Manahan IV . Nov 13, 2026
  • Bentley named Official Partner of Parisian football club
    Bentley named Official Partner of Parisian football club
    Paulo Papa . Nov 13, 2026
  • Check out the most-viewed nameplates on Zigwheels PH
    Check out the most-viewed nameplates on Zigwheels PH
    Paulo Papa . Nov 13, 2026
  • Nameplates that will help move delegates in ASEAN 2026 Summit
    Nameplates that will help move delegates in ASEAN 2026 Summit
    Paulo Papa . Nov 13, 2026
  • VinFast VF8 vs. the competition
    VinFast VF8 vs. the competition
    Cesar Miguel . Nov 12, 2026
  • Chery QEV: initial impressions
    Chery QEV: initial impressions
    Paulo Papa . Nov 10, 2026
  • Is the new Honda City, City Hatchback worth the money?
    Is the new Honda City, City Hatchback worth the money?
    Paulo Papa . Oct 24, 2026
  • Here’s how to protect your paint, upholstery, dash from super El Niño heat
    Here’s how to protect your paint, upholstery, dash from super El Niño heat
    Cesar Miguel . Nov 13, 2026
  • 3 safe driving tips to remember this Undas
    3 safe driving tips to remember this Undas
    Paulo Papa . Nov 01, 2026
  • Getting your car ready for El Niño
    Getting your car ready for El Niño
    Cesar Miguel . Oct 30, 2026
  • Weighing down on car parking
    Weighing down on car parking
    Paulo Papa . Sep 24, 2026
  • Tips on how to prevent vehicle fires
    Tips on how to prevent vehicle fires
    Cesar Miguel . Mar 17, 2026
  • ELECTRIA: Riddara RD6 Econ 73 kWh Long Bed is a huge but comfy daily
    ELECTRIA: Riddara RD6 Econ 73 kWh Long Bed is a huge but comfy daily
    Cesar Miguel . Oct 28, 2026
  • Sedan supremacy: Toyota Corolla Altis GR-S HEV
    Sedan supremacy: Toyota Corolla Altis GR-S HEV
    Paulo Papa . Aug 27, 2026
  • First drive: Kia Sportage Turbo Hybrid
    First drive: Kia Sportage Turbo Hybrid
    Cesar Miguel . Aug 18, 2026
  • First impressions: Geely EX2
    First impressions: Geely EX2
    Cesar Miguel . Jun 18, 2026
  • ELECTRIA: VinFast VF 6 is a well-equipped urban warrior
    ELECTRIA: VinFast VF 6 is a well-equipped urban warrior
    Cesar Miguel . Apr 20, 2026