SMC: Closure needed to speed up completion of Skyway 3 ramps

Skyway Stage 3

Finally, some clarity on the burning issue of the moment.

SMC Corporation president Ramon Ang said that the Skyway's closure is needed to speed up the completion of its ramps at the Skyway 3 portion. This is in light of the Toll Regulatory Board's refusal of the start of toll collection at the Skyway Stage 3 while construction isn't complete.

The SMC head the revelation following the confusion on the earlier announcement that the major connector road will be closed indefinitely.

“Basically, TRB is insisting that Skyway 3 cannot start full operations and collect toll until all ramps are 100% complete. Our supplemental toll operation agreement states that we can start collecting at 95% completion—we are now 97% complete,” Ang said.

Skyway Stage 3

“We need sufficient funds for the toll road’s daily maintenance, proper long-term upkeep and to keep it safe and efficient for the motoring public. As Skyway 3’s losses have been mounting because TRB keeps delaying the start of toll collection, the quickest way for our infrastructure unit to speed up 100% completion of the ramps would have been to close Skyway 3,” he added. 

According to the SMC executive, Department of Transportation (DOTr) Sec. Arthur Tugade “understands their predicament,” citing that Skyway 3 was built at no cost to government.

“SMC fully-funded the over P80 billion cost to build it. After years of hard work, we opened it last December 29 so we can start serving the public for free, for a reasonable amount of time," he noted.

"We have also made a lot of concessions—including lowering toll fees—in the interest of the public. Also, Skyway 3 is new, but heavy everyday use causes it to deteriorate if not maintained properly. We spend a lot for its upkeep, and at the same time lose a lot in foregone revenues. We cannot operate this and serve people if the project is not generating revenues,” Ang expounded.

Further, the SMC noted the cost in putting up the Skyway Stage 3 significantly increased with challenges following the acquisition of right-of-way leading to major redesigns, realignments, reconstructing which raised costs and extended the construction across two government administrations.

Ang said SMC paid for all right-of-way costs, including paying of properties at prevailing market value to ramp up the completion, shouldered the cost to relocate utilities, and the reconstruction of three bridges.

Skyway3

Moreover, Ang said that they have also revised the original proposed fare matrix to significantly lower toll rates so as not to carry the burden of high toll rates.

“In good faith, during our earlier discussions with TRB, we lowered the proposed toll rates significantly. Basically, we took out and deferred collection of most of the cost of right-of-way acquisition. After that, we lowered the rates even further, so that people travelling short distances would pay much less,” Ang said. 

Furthermore, Ang explained that at a cost of P10 billion per year to operate the toll road, it is expected to only generate a significantly lower revenue of P4 billion per year based on its proposed toll rate and the existing 60,000 daily volume of vehicles.

“Basically, we have done everything to make sure we can viably operate Skyway 3 right away, so we can serve motorists and fulfill our goal, which is to lessen traffic in Metro Manila and hopefully, through better connectivity, create more jobs and economic opportunities for more Filipinos. This is really a team effort, and we need to work together for our country succeed,” Ang said.

“Skyway 3 will remain open,” he declared, saying that he has relayed the same message commitment to Sec. Tugade who, in turn, committed to act upon the company’s concerns with urgency and prudence.

All’s well that ends well?

Photos from Ruben D. Manahan IV, San Miguel Corporation

Also read:

2 new Skyway 3 ramps opened

SMC’s free toll to medical frontliners reaches P156M, extends to Skyway Stage 3

SMC banks on SLEX TR5, Pasig River Expressway as next game-changers

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • Porsche Taycan EV conquers flooded street in Dubai
    Porsche Taycan EV conquers flooded street in Dubai
    Paulo Papa . Today
  • PHRX, AAP ready for upcoming Kagitingan Rally of Capas
    PHRX, AAP ready for upcoming Kagitingan Rally of Capas
    Ruben Manahan IV . Today
  • Dongfeng PH offers extended battery warranty for EV lineup
    Dongfeng PH offers extended battery warranty for EV lineup
    Paulo Papa . Today
  • MMDA to partially close portion of EDSA-Kamuning flyover starting May
    MMDA to partially close portion of EDSA-Kamuning flyover starting May
    Paulo Papa . Today
  • Mazda MX-5 dominates 2024 Petron Makabayan Endurance Cup
    Mazda MX-5 dominates 2024 Petron Makabayan Endurance Cup
    Paulo Papa . Today
  • Which is the better choice: Toyota Corolla Cross or Yaris Cross?
    Which is the better choice: Toyota Corolla Cross or Yaris Cross?
    Paulo Papa . Apr 22, 2024
  • Hard-hitting hybrids: Toyota Corolla Cross vs. Nissan Kicks e-Power
    Hard-hitting hybrids: Toyota Corolla Cross vs. Nissan Kicks e-Power
    Paulo Papa . Apr 22, 2024
  • Toyota Corolla Cross: Old vs. new
    Toyota Corolla Cross: Old vs. new
    Paulo Papa . Apr 17, 2024
  • Here are the new Toyota Corolla Cross variants
    Here are the new Toyota Corolla Cross variants
    Paulo Papa . Apr 17, 2024
  • MIAS 2024: Here’s what transpired on the first day of the annual auto expo
    MIAS 2024: Here’s what transpired on the first day of the annual auto expo
    Paulo Papa . Apr 06, 2024
  • Here are some ideal destinations and safety tips for the upcoming Holy Week
    Here are some ideal destinations and safety tips for the upcoming Holy Week
    Paulo Papa . Mar 08, 2024
  • Here are some New Year’s resolutions for car owners
    Here are some New Year’s resolutions for car owners
    Paulo Papa . Jan 03, 2024
  • PH auto market: 2023 in retrospect
    PH auto market: 2023 in retrospect
    Paulo Papa . Dec 15, 2023
  • Here’s a holiday gift guide for car enthusiasts
    Here’s a holiday gift guide for car enthusiasts
    Hazel Nicole Carreon . Dec 15, 2023
  • Oil players cut pump prices anew
    Oil players cut pump prices anew
    Paulo Papa . Nov 14, 2023
  • ELECTRIA: Toyota Zenix Q Hybrid is fit for modern families
    ELECTRIA: Toyota Zenix Q Hybrid is fit for modern families
    Ruben Manahan IV . Apr 02, 2024
  • First look: JMC Vigus
    First look: JMC Vigus
    Paulo Papa . Apr 01, 2024
  • First look: JMC Grand Avenue
    First look: JMC Grand Avenue
    Paulo Papa . Mar 27, 2024
  • Above average: Toyota Raize G
    Above average: Toyota Raize G
    Paulo Papa . Mar 22, 2024
  • BYD Atto 3: from the metro to the mountains
    BYD Atto 3: from the metro to the mountains
    Paulo Papa . Mar 18, 2024