DPWH targets Panay-Guimaras-Negros Island Bridges DED activities in Q1 2023

pgn island bridges

The Department of Public Works and Highways (DPWH) announced that the government agency is looking to begin detailed engineering design (DED) activities for the Panay-Guimaras-Negros Island Bridges in the first quarter of 2023.

KEY TAKEAWAYS

  • What engineering services are involved in the planned DED activities by DPWH?

    Per Sadain, the engineering services are involved in the planned DED activities by DPWH include preliminary design covering review of the feasibility study and preliminary and basic design, among others.
  • How many bridges are planned for the Panay-Guimaras-Negros Island Bridges project?

    The Panay-Guimaras-Negros Island Bridges project will see the construction of two sea-crossing bridges connecting Panay Island, Guimaras Island, and Negros Island in Region 6.
  • Per DPWH Undersecretary Emil Sadain, the engineering services involved in the DED activities are preliminary design covering review of the feasibility study and preliminary and basic design; detailed engineering design including estimation of detailed construction cost; and procurement assistance.

    Senior Undersecretary Sadain together with Pulupandan, Negros Occidental Mayor Miguel Antonio Peña, and the five DPWH Unified Project Management Office (UPMO) Project Directors namely Benjamin Bautista, Sharif Madsmo Hasim, Ramon Arriola III, Rodrigo Delos Reyes, and Soledad Florencio conducted an on-ground assessment on November 10, 2022, of the proposed location of road approach at the Negros Island side.

    pgn island bridges 1

    The 32.47-kilometer (km) Panay-Guimaras-Negros Island Bridges project is a large and complex project that requires comprehensive and high-standard engineering works to be serviced by consultants who have extensive experience in long-span bridges, which will help DPWH prepare for the construction in an efficient and timely manner.

    It is composed of two sea-crossing bridges connecting Panay Island, Guimaras Island, and Negros Island in Region 6.

    The linkage between Guimaras-Negros will comprise a sea-crossing bridge with an approximate length of 13.1km, road approaches with an approximate total length of 5.4km, and road connectors of 0.87km, with a total length of 19.4km.

    On the other hand, the linkage between Panay-Guimaras or Section A will comprise a sea-crossing bridge with an approximate length of 4.97km and a road approach with an approximate total length of 8.03km, with a total length of 13.0km.

    pgn island bridges 2

    Once the interlink bridges are constructed, the travel time of commuters and motorists as well as the transport of goods from Panay to Negros Islands through ferries or via the Roll-on, Roll-off ships (Ro-Ro) will be shortened from three to four hours to just less than one hour.

    Photos from DPWH

    Also read: 

    DPWH to put up new flyover in Bataan

    Lawmaker pushes for bigger DPWH budget for 2023

    DPWH opens new FMRs in Bataan

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    • Dongfeng Nissan debuts NX8 midsize BEV, REEV SUV
      Dongfeng Nissan debuts NX8 midsize BEV, REEV SUV
      Cesar Miguel . Apr 17, 2026
    • Mitsubishi Motors PH to update Triton Athlete?
      Mitsubishi Motors PH to update Triton Athlete?
      Paulo Papa . Apr 17, 2026
    • Nissan to cut down global portfolio to 45 nameplates
      Nissan to cut down global portfolio to 45 nameplates
      Cesar Miguel . Apr 17, 2026
    • Here’s the all-new Honda Prelude in 8 photos
      Here’s the all-new Honda Prelude in 8 photos
      Ruben Manahan IV . Apr 17, 2026
    • Toyota Corolla Cross V HEV available at just P17k monthly this April
      Toyota Corolla Cross V HEV available at just P17k monthly this April
      Cesar Miguel . Apr 16, 2026
    • GAC GS8 HEV vs. other hybrid mid-size SUVs
      GAC GS8 HEV vs. other hybrid mid-size SUVs
      Paulo Papa . Apr 17, 2026
    • Check out upcoming Geely EX2’s potential rivals
      Check out upcoming Geely EX2’s potential rivals
      Cesar Miguel . Apr 15, 2026
    • Jaecoo J5 SHS-S: 5 stylish hues
      Jaecoo J5 SHS-S: 5 stylish hues
      Paulo Papa . Apr 13, 2026
    • Examples of major autonomous driving companies from around the world
      Examples of major autonomous driving companies from around the world
      Cesar Miguel . Apr 01, 2026
    • Changan CS15: what are the updates?
      Changan CS15: what are the updates?
      Paulo Papa . Mar 30, 2026
    • Tips on how to prevent vehicle fires
      Tips on how to prevent vehicle fires
      Cesar Miguel . Mar 17, 2026
    • How to prepare your car for summer
      How to prepare your car for summer
      Cesar Miguel . Mar 11, 2026
    • Avoid road trip horror stories this 'Undas' with these tips
      Avoid road trip horror stories this 'Undas' with these tips
      Ruben Manahan IV . Oct 20, 2025
    • Here are ways to avoid road rage
      Here are ways to avoid road rage
      Paulo Papa . Sep 23, 2025
    • How well do you understand traffic signs?
      How well do you understand traffic signs?
      Cesar Miguel . Sep 09, 2025
    • BYD DM-i lineup conquers Southern Luzon
      BYD DM-i lineup conquers Southern Luzon
      Cesar Miguel . Mar 10, 2026
    • Hyundai Creta Premium: balancing engaging drive,comfort
      Hyundai Creta Premium: balancing engaging drive,comfort
      Cesar Miguel . Feb 13, 2026
    • First drive: 4th-gen Changan CS55 Plus
      First drive: 4th-gen Changan CS55 Plus
      Paulo Papa . Feb 09, 2026
    • Changan CS15: small upgrades makes the difference
      Changan CS15: small upgrades makes the difference
      Cesar Miguel . Feb 06, 2026
    • First drive: Changan Eado Plus
      First drive: Changan Eado Plus
      Paulo Papa . Feb 03, 2026