From land to air: SMC to create road, rail networks going to Bulacan airport

Ramon Ang

The leadership of San Miguel Corporation is making sure there will be direct roads leading to their P740-billion Bulacan airport project.

In a statement, SMC president and chief operating officer Ramon Ang said that such project is set to help decongest EDSA while providing continuous travel.

“These projects make up the massive infrastructure network that will not only make the airport easily accessible from Metro Manila and various points of Luzon, but will also further unlock the economic potential of so many of our provinces,” Ang explained.

“Taken together with the airport, travel and trade in Luzon, Visayas, Mindanao and outside the country will be easier and more efficient. This is part of our commitment to invest more in our country and help our government and our people build back better,” he added.

 

The SMC chief lauded the support given by the local government units in Bulacan and supporting the former’s infrastructure projects that will be built to complement the airport transport system.

“We’re happy that the local government leaders also share our vision for the development of Bulacan through this airport. With the LGUs agreeing to align their own road network projects to those that will be built by San Miguel, we can significantly reduce traffic congestion and improve the transport system in the province,” Ang said.

According to SMC, their airport development plan will comprise of an eight-kilometer airport toll road that will enjoin the airport to the North Luzon Expressway (NLEX) and link it to the recently-completed 18-kilometer Skyway Stage 3 going to the South Luzon Expressway (SLEX).

It was in mid-October this year when SMC announced the completion of the Skyway 3 project. Such proclamation was made weeks prior to the targeted October 31 full accomplishment.

Ramon Ang

During a meeting with Bulacan LGUs, the private firm presented several road expressway projects such as the following:

  • NMIA Airport Expressway,
  • Integrated Airport Toll Expressway Network-Northern Access Link,
  • Integrated Airport Toll Expressway Network-Southern Access Link,
  • Integrated Airport Toll Expressway Network- Central Access Link,
  • East Metro Manila Expressway,
  • Northeast Airport Expressway,
  • Calamba-San Pedro Expressway,
  • Bulacan-Tarlac Expressway (BTEX),
  • Bataan-Bulacan Expressway (BBEX),
  • Skyway Stage 3-R10 NMIA Expressway,
  • MRT 7 Road, and
  • NMIA Expressway MRT 7 (Road Spur Access).

Meanwhile, the suggested railway transport modes—which are all granted as "Original Proponent Status":

  • MRT7 Katipunan Spur,
  • MRT7 Airport Expressway-North Line,
  • MRT7 Airport Expressway-West Line,
  • MRT7 Extension Project, and
  • MRT7 Airport Expressway Southeast Line.

“These proposed rail and road networks that will form part of a seamless transport system will allow the province to accommodate the millions of passengers who will enter the country through the Bulacan airport every year. It will also allow the smooth delivery of goods and services, particularly coming from the Bulacan Airport City Economic Zone that is expected to attract business locators and provide employment to local residents,” Ang noted.

Photos from San Miguel Corporation

Also read:

SMC banks on SLEX TR5, Pasig River Expressway as next game-changers

SMC resumes work on Skyway extension, devises new traffic scheme

Expressways extend deadline of RFID cashless payment implementation

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • EV industry-related concerns eyed to be addressed at 13th PEVS
    EV industry-related concerns eyed to be addressed at 13th PEVS
    Cesar Miguel . Today
  • Nissan ends R35 GT-R production
    Nissan ends R35 GT-R production
    Cesar Miguel . Aug 27, 2025
  • New PH-spec Mini John Cooper Works lineup unveiled
    New PH-spec Mini John Cooper Works lineup unveiled
    Cesar Miguel . Aug 26, 2025
  • Nissan NISMO teams up with Casio for motorsport-inspired timepiece
    Nissan NISMO teams up with Casio for motorsport-inspired timepiece
    Paulo Papa . Aug 26, 2025
  • Will Mitsubishi Motors PH unveil the Destinator soon?
    Will Mitsubishi Motors PH unveil the Destinator soon?
    Ruben Manahan IV . Aug 26, 2025
  • Check out the Toyota Land Cruiser’s key competitors
    Check out the Toyota Land Cruiser’s key competitors
    Cesar Miguel . Aug 26, 2025
  • Colorful Filipino nicknames for iconic car models
    Colorful Filipino nicknames for iconic car models
    Cesar Miguel . Aug 22, 2025
  • Here are the JMC Vigus' 2 options in PH
    Here are the JMC Vigus' 2 options in PH
    Paulo Papa . Aug 20, 2025
  • Check out the Omoda C5's 3 trims
    Check out the Omoda C5's 3 trims
    Paulo Papa . Aug 19, 2025
  • Check out the Omoda C5’s key rivals
    Check out the Omoda C5’s key rivals
    Cesar Miguel . Aug 18, 2025
  • Do you still need to wash your car after it rains?
    Do you still need to wash your car after it rains?
    Cesar Miguel . Jun 12, 2025
  • What should you visit first at MIAS 2025?
    What should you visit first at MIAS 2025?
    Cesar Miguel . Apr 11, 2025
  • Do you really need 4x4 for overlanding?
    Do you really need 4x4 for overlanding?
    Cesar Miguel . Mar 26, 2025
  • Number coding 2025: what you need to know
    Number coding 2025: what you need to know
    Paulo Papa . Mar 09, 2025
  • EVs still require lubrication, JAMA execs say
    EVs still require lubrication, JAMA execs say
    Paulo Papa . Mar 09, 2025
  • First drive: Here’s why the Li Mega is the ideal pick for those who wants to be chauffeured
    First drive: Here’s why the Li Mega is the ideal pick for those who wants to be chauffeured
    Paulo Papa . Aug 27, 2025
  • GWM Cannon: range day
    GWM Cannon: range day
    Paulo Papa . Jul 29, 2025
  • First drive: BYD Sealion 5 DM-i
    First drive: BYD Sealion 5 DM-i
    Cesar Miguel . Jul 21, 2025
  • Honda BR-V S CVT: all about that ‘base’
    Honda BR-V S CVT: all about that ‘base’
    Paulo Papa . Jul 09, 2025
  • Dongfeng Rich 7 4X4 Upper: ideal entry-level truck
    Dongfeng Rich 7 4X4 Upper: ideal entry-level truck
    Paulo Papa . Jul 07, 2025