Groundworks for Pasacao-Balatan Tourism Coastal Highway now underway

Pasacao-Balatan_Tourism_Coastal_Highway_in_Camarines_Sur_Underway_1

The coastal road project connecting the municipalities of Pasacao, San Fernando, Minalabac, Bula, and Balatan has started, promising more economic opportunities in the Bicol Region.

The Pasacao-Balatan Tourism Coastal Highway runs a total of 40.69 kilometers and will connect the aforementioned municipalities along with 15 more barangays, namely San Cirilo, Balogo, Bical, Gñaran, Pinamasagan, Cotmo, Bagolatao, San Antonio, Salingogon, Hamoraon, Itangon, Caorasan, Camanghan, Pararao, and Luluasan. 

Pasacao-Balatan_Tourism_Coastal_Highway_in_Camarines_Sur_Underway_2

Department of Public Works and Highways (DPWH) Secretary Mark Villar said that the coastal road project aims to promote ecotourism in Camarines Sur.

When completed, the Pasacao-Balatan Tourism Coastal Highway can improve traffic conditions, making tourist spots like the iconic Mayon Volcano and the peninsula of Caramoan easily accessible for those coming from nearby cities. The region of Bicol has always been a popular tourist destination with pristine white sand beaches, caves, limestone cliffs, waterfalls, and coral reefs.

The completion of this project will make traveling to these tourist spots more convenient. Another perceived benefit of the aforementioned project is the improved logistics of goods like local wares and other commodities. 

The coastal road network not only looks to boost the region’s local economy but also improve traffic for more than 4,000 motorists daily. 

The Pasacao-Balatan Tourism Coastal Highway will effectively reduce travel time from the municipality of Pasacao to Balatan, and vice versa, from an average of 2 hours and 12 minutes to only 41 minutes

The DPWH Secretary stated that their office has received an allocation of P405.6 million from the 2018-2020 General Appropriations Act (GAA) so far. Currently, the coastal road project is 2.06 percent complete with a projected cost of P14.97 billion and will run as a multi-year project. 

The Pasacao-Balatan Tourism Coastal Highway is a project of National Economic and Development Authority’s (NEDA) and the current administration’s Build, Build, Build program. The road network includes 13 bridges with culverts, intersections, service roads, and other related infrastructures. 

Photos from Department of Public Works and Highways

Also Read: 

Latest FMR boosts economy in Minalabac, CamSur 

Cagayan’s Baculud Bridge II widening nears completion

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • All-new Hyundai Kona to be revealed at this week’s HME?
    All-new Hyundai Kona to be revealed at this week’s HME?
    Ruben Manahan IV . Today
  • Study: Ford, Toyota, Nissan secure highest CX score in PH
    Study: Ford, Toyota, Nissan secure highest CX score in PH
    Ruben Manahan IV . Today
  • Hyundai teases Ioniq 6 N
    Hyundai teases Ioniq 6 N
    Ruben Manahan IV . Today
  • PH-spec BYD Tang to be offered in PHEV version soon?
    PH-spec BYD Tang to be offered in PHEV version soon?
    Ruben Manahan IV . Today
  • Here are some details about the PH-spec GWM Haval H9
    Here are some details about the PH-spec GWM Haval H9
    Ruben Manahan IV . Jun 16, 2025
  • Apps in PH that make driving smarter, safer
    Apps in PH that make driving smarter, safer
    Cesar Miguel . Today
  • Check out the Suzuki Carry's perks, drawbacks
    Check out the Suzuki Carry's perks, drawbacks
    Cesar Miguel . Today
  • Pickup truck comparo: GWM Cannon vs Dongfeng Rich 7
    Pickup truck comparo: GWM Cannon vs Dongfeng Rich 7
    Paulo Papa . Jun 16, 2025
  • Here are the Suzuki Dzire Hybrid's main rivals
    Here are the Suzuki Dzire Hybrid's main rivals
    Cesar Miguel . Jun 13, 2025
  • Picks for pops: best gifts for dads this Father’s Day
    Picks for pops: best gifts for dads this Father’s Day
    Paulo Papa . Jun 13, 2025
  • Do you still need to wash your car after it rains?
    Do you still need to wash your car after it rains?
    Cesar Miguel . Jun 12, 2025
  • What should you visit first at MIAS 2025?
    What should you visit first at MIAS 2025?
    Cesar Miguel . Apr 11, 2025
  • Do you really need 4x4 for overlanding?
    Do you really need 4x4 for overlanding?
    Cesar Miguel . Mar 26, 2025
  • Number coding 2025: what you need to know
    Number coding 2025: what you need to know
    Paulo Papa . Mar 09, 2025
  • EVs still require lubrication, JAMA execs say
    EVs still require lubrication, JAMA execs say
    Paulo Papa . Mar 09, 2025
  • Suzuki Ertiga Hybrid: modest mover
    Suzuki Ertiga Hybrid: modest mover
    Paulo Papa . Jun 05, 2025
  • ELECTRIA: 2025 BYD Atto 3 - updates done right
    ELECTRIA: 2025 BYD Atto 3 - updates done right
    Cesar Miguel . Jun 05, 2025
  • Dongfeng Nammi: Stylish all-rounder
    Dongfeng Nammi: Stylish all-rounder
    Cesar Miguel . May 21, 2025
  • First drive: Suzuki Dzire Hybrid
    First drive: Suzuki Dzire Hybrid
    Cesar Miguel . May 02, 2025
  • Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
    Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
    Ruben Manahan IV . Apr 30, 2025