Marcos Jr. leads CAVITEX milestone events

Marcos Jr at CAVITEX 2

President Ferdinand Marcos Junior (Jr.) has led groundbreaking and inauguration ceremonies along sections of the Manila-Cavite Expressway (CAVITEX).

KEY TAKEAWAYS

  • For how long will the CAVITEX C5 Link Sucat Interchange remain toll-free?

    The CAVITEX C5 Link Sucat Interchange will remain toll-free for one month.
  • BY how much will the CAVITEX C5 Link cut travel time in the south?

    Per DPWH, travel time from SLEX/C5 and CAVITEX will be shortened from 40-10 minutes once the project is complete.
  • The country’s figurehead was present in various events held on the CAVITEX C5 Link and Cavite-Laguna Expressway (CALAX) Link Project. He was joined by Department of Public Works and Highways (DPWH) Secretary Manuel Bonoan and project concessionaire Metro Pacific Tollways Corporation (MPTC) Chairman Manuel Pangilinan.

    Marcos Jr at CAVITEX 1

    Also present were Senator Mark Villar, Department of Transportation Secretary Jaime Bautista, Philippine Reclamation Authority General Manager Cesar Siador, MPTC President and Chief Executive Rogelio Singson, and DPWH Undersecretary Maria Catalina Cabral.

    Marcos Jr. participated in the inauguration of the 1.9-kilometer Segment 2 or the Sucat Interchange of CAVITEX C5 Link which now connects CAVITEX Interchange to the Sucat Interchange of the project.

    No fees will be collected at the newly-opened segment for a month.

    Two other segments of the project are already operational, namely the 2.20-kilometer Segment 3A-1 which starts from Merville to C5/South Luzon Expressway (SLEX), and the 1.6-kilometer Segment 3A-2 from E. Rodriguez to Merville.

    The Head of State also led the groundbreaking of the remaining two-kilometer Segment 3B of the CAVITEX C5 Link. The said segment will complete the project by connecting the Sucat Interchange to E. Rodriguez.

    It is expected to be completed next year.

    Upon completion, the P12.65 billion CAVITEX C5 Link will be a 7.7-kilometer, six-lane toll road that will decongest traffic in major business districts in Makati and Taguig, as well as in Cavite, Paranaque, and Las Pinas.

    Travel time from SLEX/C5 and CAVITEX will be shortened from 40-10 minutes.

    Marcos Jr at CAVITEX

    Another high-impact project that broke ground last week was the 1.2-kilometer CAVITEX-CALAX Link Project, which is seen to decongest traffic in Cavite, specifically along Centennial Road from Gahak to Tirona Highway.

    Per the DPWH, the project will directly link the coastal expressway and CALAX, with alignment crossing Tirona Highway at Barangay Binakayan and Daang Bangkal Road at Barangay Marulas in Kawit, and Centennial Road at Barangay Pag-asa III in Imus.

    Photos from Department of Public Works and Highways Facebook page

    Also read:

    Lawmaker bats for higher speed limits on expressways

    CALAX Silang Interchange is 91-percent finish

    Traffic volume at MPTC-operated expressways could go up to 15% on Holy Week

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    • Aston Martin launches DBX S
      Aston Martin launches DBX S
      Cesar Miguel . Today
    • Toyota partners up with Waymo to accelerate self-driving tech development
      Toyota partners up with Waymo to accelerate self-driving tech development
      Cesar Miguel . Today
    • Hyundai Motor PH updates Roadside Assistance Program
      Hyundai Motor PH updates Roadside Assistance Program
      Cesar Miguel . Today
    • Nissan introduces 'Dare to Get More' summer aftersales raffle promo
      Nissan introduces 'Dare to Get More' summer aftersales raffle promo
      Cesar Miguel . Apr 30, 2025
    • Lynk & Co 900 breaks cover at Auto Shanghai 2025
      Lynk & Co 900 breaks cover at Auto Shanghai 2025
      Paulo Papa . Apr 30, 2025
    • Work wheels: vehicles that help industries move
      Work wheels: vehicles that help industries move
      Paulo Papa . Apr 30, 2025
    • Let’s check out the Nissan Patrol's classy interior
      Let’s check out the Nissan Patrol's classy interior
      Cesar Miguel . Apr 30, 2025
    • Here are the BYD eMAX 7's 4 hues
      Here are the BYD eMAX 7's 4 hues
      Paulo Papa . Apr 28, 2025
    • Isuzu mu-X's 5 elegant hues in PH
      Isuzu mu-X's 5 elegant hues in PH
      Cesar Miguel . Apr 28, 2025
    • Here's a closer look at the PH-spec BYD eMAX 7's variants
      Here's a closer look at the PH-spec BYD eMAX 7's variants
      Paulo Papa . Apr 28, 2025
    • What should you visit first at MIAS 2025?
      What should you visit first at MIAS 2025?
      Cesar Miguel . Apr 11, 2025
    • Do you really need 4x4 for overlanding?
      Do you really need 4x4 for overlanding?
      Cesar Miguel . Mar 26, 2025
    • Number coding 2025: what you need to know
      Number coding 2025: what you need to know
      Paulo Papa . Mar 09, 2025
    • EVs still require lubrication, JAMA execs say
      EVs still require lubrication, JAMA execs say
      Paulo Papa . Mar 09, 2025
    • Ensure your vehicle is Summer road trip-ready by following these tips
      Ensure your vehicle is Summer road trip-ready by following these tips
      Paulo Papa . Mar 06, 2025
    • Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
      Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
      Ruben Manahan IV . Apr 30, 2025
    • First drive: Changan Lumin
      First drive: Changan Lumin
      Cesar Miguel . Apr 22, 2025
    • JAC JS4: from daily drives to ‘vacay’ vibes
      JAC JS4: from daily drives to ‘vacay’ vibes
      Paulo Papa . Apr 22, 2025
    • First drive: Jetour X70 Lightning i-DM
      First drive: Jetour X70 Lightning i-DM
      Paulo Papa . Apr 03, 2025
    • Changan CS15: no-fuss daily driver
      Changan CS15: no-fuss daily driver
      Cesar Miguel . Mar 27, 2025