MPT South expects 30% more toll road users in 2025

CAVITEX C5 Link

MPT South said that traffic volume for the Cavite-Laguna Expressway (CALAX) and CAVITEX C5 Link will grow to more than 340,000 by the end of next year.

KEY TAKEAWAYS

  • What will spur the growth in traffic volume in the area?

    The increase in traffic volume will be driven by the completion of several key segments in CALAX and CAVITEX C5 Link.
  • How much was allocated for the projects in MPT South-managed expressways?

    The company allotted P14 billion in capital expenditures (CAPEX) for 2025 to support the construction and maintenance of its infrastructure.
  • In a statement, the Metro Pacific Tollways Corporation subsidiary said that the expected rise of toll road users is 30 percent higher than the current figure of 259,815.

    According to the toll road operator, the increase will be driven by the completion of several key segments in CALAX and CAVITEX C5 Link. The said sections include the CALAX Governor’s Drive Interchange, Open Canal Interchange, and Kawit Interchange, as well as the C5 Link Segment 3B, which will connect the current Sucat Interchange to the C5 Link Flyover Extension, spanning from SLEX-Taguig to E. Rodriguez in C5.

    CAVITEX Photo from MPT South

    Currently under construction, the CAVITEX-CALAX Link will merge the two toll roads. Upon completion, the MPT South’s total road network shall reach 67 kilometers.

    “Aside from providing an enhanced driving experience for our motorists, our projects also aim to contribute to the region’s economic development by improving accessibility and connectivity.  Once completed, our expressway network will provide a more seamless travel experience for over 340,000 motorists, a 30-percent increase from our existing daily traffic, and help spur economic growth in both regions,” MPT South President and General Manager Raul Ignacio said.

    CALAX Photo from MPT South

    The company allotted P14 billion in capital expenditures (CAPEX) for 2025 to support the construction and maintenance of its infrastructure.

    “Despite the challenges we face in construction, such as the timely delivery of right-of-way and the recent typhoons, we are working around the clock to ensure the delivery of these vital infrastructure projects for the benefit of progress by the end of 2025,” he added.

    Also read:

    30-day toll holiday to be implemented in CAVITEX

    Marcos Jr. leads CAVITEX milestone events

    CALAX Silang Interchange is 91-percent finish

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    • Volvo PH May 2025 MoM sales up by 550%
      Volvo PH May 2025 MoM sales up by 550%
      Ruben Manahan IV . Jul 01, 2025
    • Mitsubishi Motors PH launches 'Prepaid Maintenance Parts package'
      Mitsubishi Motors PH launches 'Prepaid Maintenance Parts package'
      Ruben Manahan IV . Jul 01, 2025
    • CMEPA now in effect; pickup truck prices to go up soon
      CMEPA now in effect; pickup truck prices to go up soon
      Ruben Manahan IV . Jul 01, 2025
    • Volvo to release XC60 PHEV in PH?
      Volvo to release XC60 PHEV in PH?
      Ruben Manahan IV . Jul 01, 2025
    • Lamborghini secures first-ever 24 Hours of Spa victory
      Lamborghini secures first-ever 24 Hours of Spa victory
      Cesar Miguel . Jul 01, 2025
    • Check out the MG Marvel R’s strengths, weaknesses
      Check out the MG Marvel R’s strengths, weaknesses
      Cesar Miguel . Jun 30, 2025
    • Here is a quick look at Suzuki XL7 Hybrid sole option in PH
      Here is a quick look at Suzuki XL7 Hybrid sole option in PH
      Paulo Papa . Jun 30, 2025
    • Toyota RAV4 vs. other hybrid crossovers
      Toyota RAV4 vs. other hybrid crossovers
      Paulo Papa . Jun 30, 2025
    • Here are the BYD Sealion 5 DM-i's 4 subtle shades
      Here are the BYD Sealion 5 DM-i's 4 subtle shades
      Paulo Papa . Jun 27, 2025
    • Check out the PH-spec GWM Cannon's 5 colors
      Check out the PH-spec GWM Cannon's 5 colors
      Paulo Papa . Jun 27, 2025
    • Do you still need to wash your car after it rains?
      Do you still need to wash your car after it rains?
      Cesar Miguel . Jun 12, 2025
    • What should you visit first at MIAS 2025?
      What should you visit first at MIAS 2025?
      Cesar Miguel . Apr 11, 2025
    • Do you really need 4x4 for overlanding?
      Do you really need 4x4 for overlanding?
      Cesar Miguel . Mar 26, 2025
    • Number coding 2025: what you need to know
      Number coding 2025: what you need to know
      Paulo Papa . Mar 09, 2025
    • EVs still require lubrication, JAMA execs say
      EVs still require lubrication, JAMA execs say
      Paulo Papa . Mar 09, 2025
    • First drive: MG ZS Hybrid+
      First drive: MG ZS Hybrid+
      Cesar Miguel . Jun 30, 2025
    • BYD eMAX 7 Superior Captain: MPV for modern families
      BYD eMAX 7 Superior Captain: MPV for modern families
      Paulo Papa . Jun 18, 2025
    • Suzuki Ertiga Hybrid: modest mover
      Suzuki Ertiga Hybrid: modest mover
      Paulo Papa . Jun 05, 2025
    • ELECTRIA: 2025 BYD Atto 3 - updates done right
      ELECTRIA: 2025 BYD Atto 3 - updates done right
      Cesar Miguel . Jun 05, 2025
    • Dongfeng Nammi: Stylish all-rounder
      Dongfeng Nammi: Stylish all-rounder
      Cesar Miguel . May 21, 2025