CALAX Silang Interchange is 91-percent finish

CALAX SS4

The latest subsection of the Cavite-Laguna Expressway (CALAX) is set to open soon, its toll operator shared.

KEY TAKEAWAYS

  • How many motorists is expected to benefit from the CALAX Silang (Aguinaldo) Interchange completion?

    Some 5,000 motorists could benefit from the soon-to-open portion of Cavite-Laguna Expressway.
  • What are the ongoing construction activities in the area?

    The construction activities for the aforementioned portion include the development of the toll plaza, concrete pouring for the main line and median barriers, as well as various finishing works.
  • Without sharing the estimated date of completion, Metro Pacific Tollways South (MPT South) shared in a statement that the soon-to-open CALAX Silang (Aguinaldo) Interchange is currently 91-percent complete.

    To recall, the Metro Pacific Tollways Corporation (MPTC) subsidiary announced last June that the aforementioned portion is 80-percent finished.

    Also, MPT South noted that the CALAX Silang (Aguinaldo) Interchange will provide a crucial connection to the Aguinaldo Highway, known to be Cavite’s busiest highway. Once it opens, the said portion of the expressway is expected to cater to 5,000 motorists on a daily basis.

    CALAX SS4 -Aguinaldo IC Ramps

    According to the tollway operator of the Manila-Cavite Expressway (CAVITEX), CAVITEX C5 Link segment, and CALAX, its ongoing construction activities in the area include the development of the toll plaza, concrete pouring for the main line and median barriers, as well as various finishing works. “In the upcoming phases, the focus will be on the construction of toll facilities, including road lights, signages, and sound barriers. Additionally, preparations for the toll collection system are also underway,” the company added.

    Relatedly, the toll firm said that CALAX will further expand to a total of 45 kilometers by next year and will feature eight interchanges: Technopark, Laguna Boulevard, Santa Rosa-Tagaytay Road, Silang East, Silang (Aguinaldo), Governor's Drive, Open Canal, and Kawit Interchange. It will connect to the CAVITEX-Kawit section. Currently, its operational segments stretch from Mamplasan Rotunda up to Silang East Interchange.

    Photos from MPT South

    Also read:

    MPT South tells riders sub-400cc motorcycle still prohibited on expressways

    MPTC's ‘EnviroSafe Tour’ shows advanced, environment-friendly features of CALAX, MPTC South Hub

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    • All-new Hyundai Kona to be revealed at this week’s HME?
      All-new Hyundai Kona to be revealed at this week’s HME?
      Ruben Manahan IV . Today
    • Study: Ford, Toyota, Nissan secure highest CX score in PH
      Study: Ford, Toyota, Nissan secure highest CX score in PH
      Ruben Manahan IV . Today
    • Hyundai teases Ioniq 6 N
      Hyundai teases Ioniq 6 N
      Ruben Manahan IV . Today
    • PH-spec BYD Tang to be offered in PHEV version soon?
      PH-spec BYD Tang to be offered in PHEV version soon?
      Ruben Manahan IV . Today
    • Here are some details about the PH-spec GWM Haval H9
      Here are some details about the PH-spec GWM Haval H9
      Ruben Manahan IV . Jun 16, 2025
    • Apps in PH that make driving smarter, safer
      Apps in PH that make driving smarter, safer
      Cesar Miguel . Today
    • Check out the Suzuki Carry's perks, drawbacks
      Check out the Suzuki Carry's perks, drawbacks
      Cesar Miguel . Today
    • Pickup truck comparo: GWM Cannon vs Dongfeng Rich 7
      Pickup truck comparo: GWM Cannon vs Dongfeng Rich 7
      Paulo Papa . Jun 16, 2025
    • Here are the Suzuki Dzire Hybrid's main rivals
      Here are the Suzuki Dzire Hybrid's main rivals
      Cesar Miguel . Jun 13, 2025
    • Picks for pops: best gifts for dads this Father’s Day
      Picks for pops: best gifts for dads this Father’s Day
      Paulo Papa . Jun 13, 2025
    • Do you still need to wash your car after it rains?
      Do you still need to wash your car after it rains?
      Cesar Miguel . Jun 12, 2025
    • What should you visit first at MIAS 2025?
      What should you visit first at MIAS 2025?
      Cesar Miguel . Apr 11, 2025
    • Do you really need 4x4 for overlanding?
      Do you really need 4x4 for overlanding?
      Cesar Miguel . Mar 26, 2025
    • Number coding 2025: what you need to know
      Number coding 2025: what you need to know
      Paulo Papa . Mar 09, 2025
    • EVs still require lubrication, JAMA execs say
      EVs still require lubrication, JAMA execs say
      Paulo Papa . Mar 09, 2025
    • Suzuki Ertiga Hybrid: modest mover
      Suzuki Ertiga Hybrid: modest mover
      Paulo Papa . Jun 05, 2025
    • ELECTRIA: 2025 BYD Atto 3 - updates done right
      ELECTRIA: 2025 BYD Atto 3 - updates done right
      Cesar Miguel . Jun 05, 2025
    • Dongfeng Nammi: Stylish all-rounder
      Dongfeng Nammi: Stylish all-rounder
      Cesar Miguel . May 21, 2025
    • First drive: Suzuki Dzire Hybrid
      First drive: Suzuki Dzire Hybrid
      Cesar Miguel . May 02, 2025
    • Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
      Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
      Ruben Manahan IV . Apr 30, 2025