SMC banks on SLEX TR5, Pasig River Expressway as next game-changers

SMC logo

There are two major infrastructure projects that the San Miguel Corporation (SMC) is banking on to help drive the Philippine economy.

The first of these projects, the 420-kilometer South Luzon Expressway Tollroad 5 (SLEX-TR5), will connect Quezon province and the Bicol region. The second one, the 19.40-km. Pasig River Expressway (PAREX), will link the eastern and western sides of Metro Manila.

In a statement, the two road programs are expected to “transform Luzon into a growth powerhouse within just five years.”

The two programs represent a total of P121.8 billion worth of investment into the local economy.

SMC president and COO Ramon Ang said that a huge portion of the budget will go toward the salaries of thousands of workers and payments to local contractors, materials suppliers, haulers, and the national and local governments.

“As we said before, San Miguel is fully committed to helping our country overcome this crisis. A big part of that is to continue, and not hold back, on new investments. These projects will deliver hundreds of thousands of jobs and put money in the hands of the Filipinos—sustaining and boosting our economic recovery, even as we build for a much better future,” Ang said.

“SLEX TR5 will take four years to complete, and PAREX, three years. By that time, the pandemic would have been far behind us. Other major infrastructure projects would also be complete. Our Bulacan Airport project would also be complete. So imagine: within five years, the Philippines will be transformed, and be better than ever,” he added.

Ramon Ang

Earlier, the Toll Regulatory Board (TRB) has announced that the SLEX TR5 and PAREX are certified toll road projects.

The SMC chief noted the features and benefits of the projects:

South Luzon Expressway Toll Road 5 (SLEX TR5)

  • 420-kilometer, four-lane expressway that stretches from SLEX TR4 in Brgy. Mayao, Lucena City Quezon, up to Matnog Ferry Terminal in Sorsogon
  • A P26.38-billion investment under a Build-Operate-Transfer (BOT) scheme with a concession period of 30 years, to be completed in 46 months.
  • Eyes to cut travel time from Lucena to Matnog from 9 hours to 5.5 hours, and interlinking urban centers in Quezon and Bicol
  • Eyed to provide better and safer route to tourist destinations, ports, as well as food production/agriculture areas
  • A faster alternative from Metro Manila and fast-track the the development of new growth centers in the Quezon and Bicol regions and other southern parts of the country.

Pasig River Expressway

  • 40-kilometer, six-lane, elevated expressway above Pasig River stretch that starts from Radial Road 10 (R10) in Manila and end at a connection of the South East Metro Manila Expressway (SEMME) at Circumferential Road 6 (C-6).
  • 4 billion investment under a 30-year BOT scheme, it can be completed in 36 months.
  • Targeted to decrease travel time from R-10 to C-6 to just 15 minutes and directly connect the western and eastern cities of Metro Manila.
  • Set to decongest primary corridors of R10, EDSA, and C-5 by providing connectivity among toll roads and freeways and diverting traffic to other alternative routes.
  • Meant to provide faster access to the country’s largest business districts, Makati, Ortigas, and BGC.

According to SMC, the construction for the projects will start as soon as all permits and clearances are obtained.

“Hopefully, we will be able to finalize with government and they will find our proposals favorable to the country. In the short to medium term, many of our people need jobs. Among the most affected by the economic impact of COVID-19 are laborers, those who rely on daily wages, and many in the construction industry,” Ang noted.

“We also have a lot of engineers or technical and labor workers from abroad who have either lost their jobs or decided to come home to their families, but now face an uncertain future. We can use their talent, experience, know-how, and skills to help us build our country back better,” he added.

Photo/s from San Miguel Corporation

Also read:

Toll Regulatory Board Seeks to Ban Buses from Skyway

MPTC has 3 Petitions for Toll Price Hike with TRB

SLEX Alabang SB entry reopens ahead of schedule

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • Hyundai teases Ioniq 6 N
    Hyundai teases Ioniq 6 N
    Ruben Manahan IV . Today
  • PH-spec BYD Tang to be offered in PHEV version soon?
    PH-spec BYD Tang to be offered in PHEV version soon?
    Ruben Manahan IV . Today
  • Here are some details about the PH-spec GWM Haval H9
    Here are some details about the PH-spec GWM Haval H9
    Ruben Manahan IV . Jun 16, 2025
  • Mitsubishi to showcase Outlander PHEV’s sound system at OTOTEN2025
    Mitsubishi to showcase Outlander PHEV’s sound system at OTOTEN2025
    Ruben Manahan IV . Jun 16, 2025
  • Up close: Suzuki PH previews local-spec Suzuki Fronx
    Up close: Suzuki PH previews local-spec Suzuki Fronx
    Ruben Manahan IV . Jun 14, 2025
  • Check out the Suzuki Carry's perks, drawbacks
    Check out the Suzuki Carry's perks, drawbacks
    Cesar Miguel . Today
  • Pickup truck comparo: GWM Cannon vs Dongfeng Rich 7
    Pickup truck comparo: GWM Cannon vs Dongfeng Rich 7
    Paulo Papa . Jun 16, 2025
  • Here are the Suzuki Dzire Hybrid's main rivals
    Here are the Suzuki Dzire Hybrid's main rivals
    Cesar Miguel . Jun 13, 2025
  • Picks for pops: best gifts for dads this Father’s Day
    Picks for pops: best gifts for dads this Father’s Day
    Paulo Papa . Jun 13, 2025
  • Do you remember how you got your driver’s license?
    Do you remember how you got your driver’s license?
    Cesar Miguel . Jun 12, 2025
  • Do you still need to wash your car after it rains?
    Do you still need to wash your car after it rains?
    Cesar Miguel . Jun 12, 2025
  • What should you visit first at MIAS 2025?
    What should you visit first at MIAS 2025?
    Cesar Miguel . Apr 11, 2025
  • Do you really need 4x4 for overlanding?
    Do you really need 4x4 for overlanding?
    Cesar Miguel . Mar 26, 2025
  • Number coding 2025: what you need to know
    Number coding 2025: what you need to know
    Paulo Papa . Mar 09, 2025
  • EVs still require lubrication, JAMA execs say
    EVs still require lubrication, JAMA execs say
    Paulo Papa . Mar 09, 2025
  • Suzuki Ertiga Hybrid: modest mover
    Suzuki Ertiga Hybrid: modest mover
    Paulo Papa . Jun 05, 2025
  • ELECTRIA: 2025 BYD Atto 3 - updates done right
    ELECTRIA: 2025 BYD Atto 3 - updates done right
    Cesar Miguel . Jun 05, 2025
  • Dongfeng Nammi: Stylish all-rounder
    Dongfeng Nammi: Stylish all-rounder
    Cesar Miguel . May 21, 2025
  • First drive: Suzuki Dzire Hybrid
    First drive: Suzuki Dzire Hybrid
    Cesar Miguel . May 02, 2025
  • Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
    Kia Sorento Turbo Hybrid's 4 unique features vs. most midsize SUVs
    Ruben Manahan IV . Apr 30, 2025