DOTR: December 1 deadline on contactless toll payment implementation still stands

NLEX RFID lanes

The Department of Transportation (DOTr) remained firm on its position that the final implementation of the contactless toll payment scheme will be on December 1, after extending it from November 2.

In its statement, the DOTr cited that the program, which is meant to safeguard health and safety public transport passengers and stakeholders, has been extended already.

“The implementation of the contactless toll payment scheme has been a long overdue measure, in line with the government’s inter-agency campaign to help reduce the spread of the coronavirus disease 2019 (COVID-19),”the department stated, noting the main purpose of Department Order (DO) 2020-012.

 

Following the rescheduled timetable for the implementation, the transportation department claimed that “any delay in its implementation amid the COVID-19 pandemic will only make motorists, as well as the personnel manning the toll plazas, vulnerable to unwanted and unnecessary physical contact, and hence, exposure to the deadly coronavirus.”

“With the issue of interoperability aside, the extension of the deadline for the implementation of cashless toll collections on toll roads to December 1 will provide motorists using the expressways ample time to have their vehicles equipped with the needed RFID stickers from the toll operators,” the agency maintained.

The agency, led by Secretary Arthur Tugade, mentioned that since the RFID tags are free of charge and only the load will be paid by motorists, they see that there is no additional burden to motorists.

Bocaue toll

“Further, both RFID tags are free of charge and only the load will be paid by motorists. Hence, there is no real or added financial burden for motorists. Having both RFIDs is also not confusing since the physical appearance of the tags are contrastingly different,” they said, adding that “loads of existing tags may be transferred to the new RFIDs, or may be allowed to be used during interoperability until the loads are consumed.”

The DOTr aksi said that to address the limited RFID installation sites, they are urging the operators not to defer the cashless program and increase the number of installation booths and manpower in key areas.

This cashless toll collection is part of the Toll Interoperability Project, which the government is pushing since 2017. The project has three phases:

  • implementation of 100% cashless and contactless toll payments
  • two RFID wallet usage, which will contain credits for payments
  • use of single RFID sticker and maintain only 1 wallet for toll payments.

Photos from NLEX Corporation, Department of Transportation

Also read:

Expressways extend deadline of RFID cashless payment implementation

NLEX assures effective implementation of cashless payment scheme

SMC tollroads to go full cashless

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • EV industry-related concerns eyed to be addressed at 13th PEVS
    EV industry-related concerns eyed to be addressed at 13th PEVS
    Cesar Miguel . Today
  • Nissan ends R35 GT-R production
    Nissan ends R35 GT-R production
    Cesar Miguel . Aug 27, 2025
  • New PH-spec Mini John Cooper Works lineup unveiled
    New PH-spec Mini John Cooper Works lineup unveiled
    Cesar Miguel . Aug 26, 2025
  • Nissan NISMO teams up with Casio for motorsport-inspired timepiece
    Nissan NISMO teams up with Casio for motorsport-inspired timepiece
    Paulo Papa . Aug 26, 2025
  • Will Mitsubishi Motors PH unveil the Destinator soon?
    Will Mitsubishi Motors PH unveil the Destinator soon?
    Ruben Manahan IV . Aug 26, 2025
  • Check out the Toyota Land Cruiser’s key competitors
    Check out the Toyota Land Cruiser’s key competitors
    Cesar Miguel . Aug 26, 2025
  • Colorful Filipino nicknames for iconic car models
    Colorful Filipino nicknames for iconic car models
    Cesar Miguel . Aug 22, 2025
  • Here are the JMC Vigus' 2 options in PH
    Here are the JMC Vigus' 2 options in PH
    Paulo Papa . Aug 20, 2025
  • Check out the Omoda C5's 3 trims
    Check out the Omoda C5's 3 trims
    Paulo Papa . Aug 19, 2025
  • Check out the Omoda C5’s key rivals
    Check out the Omoda C5’s key rivals
    Cesar Miguel . Aug 18, 2025
  • Do you still need to wash your car after it rains?
    Do you still need to wash your car after it rains?
    Cesar Miguel . Jun 12, 2025
  • What should you visit first at MIAS 2025?
    What should you visit first at MIAS 2025?
    Cesar Miguel . Apr 11, 2025
  • Do you really need 4x4 for overlanding?
    Do you really need 4x4 for overlanding?
    Cesar Miguel . Mar 26, 2025
  • Number coding 2025: what you need to know
    Number coding 2025: what you need to know
    Paulo Papa . Mar 09, 2025
  • EVs still require lubrication, JAMA execs say
    EVs still require lubrication, JAMA execs say
    Paulo Papa . Mar 09, 2025
  • First drive: Here’s why the Li Mega is the ideal pick for those who wants to be chauffeured
    First drive: Here’s why the Li Mega is the ideal pick for those who wants to be chauffeured
    Paulo Papa . Aug 27, 2025
  • GWM Cannon: range day
    GWM Cannon: range day
    Paulo Papa . Jul 29, 2025
  • First drive: BYD Sealion 5 DM-i
    First drive: BYD Sealion 5 DM-i
    Cesar Miguel . Jul 21, 2025
  • Honda BR-V S CVT: all about that ‘base’
    Honda BR-V S CVT: all about that ‘base’
    Paulo Papa . Jul 09, 2025
  • Dongfeng Rich 7 4X4 Upper: ideal entry-level truck
    Dongfeng Rich 7 4X4 Upper: ideal entry-level truck
    Paulo Papa . Jul 07, 2025