SMC gets Nasugbu-Bauan Expressway project

SMC-NBEX

The San Miguel Corporation (SMC) is set to undertake the P44.77-billion Nasugbu-Bauan Expressway (NBEX) project.

KEY TAKEAWAYS

  • How much is the expected expense for the Nasugbu-Bauan Expressway project?

    The project is expected to be at about P44.77 billion.
  • How long is the NBEX project when completed?

    The tollway is 61 kilometers long.
  • How long is SMC's estimated substantial completion for the NBEX project?

    SMC's target for the project's substantial completion is at 48 months, including the 12-month development of the detailed engineering design.
  • The company said that its infrastructure arm, SMC Infrastructure, has been granted a 35-year concession to design, build, operate, and maintain the four-lane, 61-kilometer toll road that is aimed to provide a faster route between the eastern and western portions of Batangas province.

    SMC and the provincial government of Batangas signed the agreement today. The event also served as the occasion wherein Ang was named an adopted son of the province.

    “This project will drive a lot of development for our province and for our towns here in the first district. Higit sa lahat, mas marami itong maibibigay na tulong at serbisyo sa ating mga mamamayan. Tunay pong partner in development ang San Miguel hindi lamang po sa Batangas, kundi sa buong Pilipinas (Aside from that, it can provide more help and services to our citizens. San Miguel is indeed a true partner in development not only in Batangas, but in the entire Philippines),” Batangas Governor Hermilando Mandanas said.

    SMC-NBEX

    For his part, Ang said that Batangas province has always been very close to his heart as many of its facilities can be found in the province. “It has always been a valuable and reliable partner of San Miguel and as such, it is vital to our efforts to support our national economy and uplift the lives of many Filipinos through regional development,” he mentioned.

     “I’m glad that our company will have another opportunity to further strengthen our collaboration with Batangas, through the NBEX, and ensure that its benefits are shared broadly," the company’s chief executive said.  

    "We have committed to deliver 70 percent of the project’s profits to the local government, once it's operational, to be used to provide vital services for our kababayans in the province. This will be key to furthering the growth of the province and improving lives and livelihood.” 

    Ang considered the NBEX as a vital infrastructure initiative in Southern Luzon. Per the company leader, the aforementioned expressway will improve travel across towns throughout Batangas, particularly the first district. It is expected to travel time between Nasugbu to Bauan, Batangas from 1.5 hours to just 45 minutes. In addition, the usual five-hour trip to and from Manila will be reduced to two hours.

    Starting at Barangay Kaylaway, Nasugbu town and runs parallel to Tagaytay-Nasugbu as well as Palico-Balayan highways, the NBEX will make Nasugbu, Balayan, Lemery, Bauan, the City of Calaca, and other municipalities, more accessible.

    SMC logo

    Further, the NBEX at Barangay Kaylaway connects the expressway to Cavite-Batangas Expressway (CBEX), which is another SMC Infrastructure project. The aforementioned road leads to Tagaytay City and Silang, Cavite.

    Moreover, the project is made up of four sections: Section 1 is a 10.78-km segment that stretches from Barangay Kaylaway to Barangay Banilad in Nasugbu town; Section 2 is a 13.03-km segment from Barangay Banilad to Balayan town; Section 3 is a 16.3-km segment from Balayan to Lemery, and Section 4 is a 20.79-km segment from Lemery to Bauan.

    And said that the target for the project's substantial completion is at 48 months, including the 12-month development of the detailed engineering design. He is optimistic that the project can be delivered on schedule given the support of the provincial government. “NBEX is an exciting opportunity for us to come together once again and work towards our common goal of building a better future for our beloved Batanguenos. We look forward to working with Governor Mandanas and the rest of the province’s leaders and stakeholders to make this a reality,” he said.

    The NBEX will be the latest addition to the growing infrastructure portfolio of SMC that includes the Tarlac-Pangasinan-La Union Expressway (TPLEX), the Skyway System that connects Balintawak to Makati through an elevated expressway; the South Luzon Expressway, and the Southern Tagalog Arterial Road ( STAR ) Tollway.

    Photos from San Miguel Corporation

    Also read:

    SMC Infra starts ‘Seamless Southern Tollways’ program

    SMC waives 84k motorists’ toll fees affected in RFID system failure

    Close, open: Public perplexed over announcement of Skyway Stage 3 'closure'

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    • Toyota Motor PH officially confirms bZ4X local launch
      Toyota Motor PH officially confirms bZ4X local launch
      Cesar Miguel . Today
    • Updated BMW 318i Professional now available in PH
      Updated BMW 318i Professional now available in PH
      Cesar Miguel . Today
    • Nissan selling Yokohama HQ
      Nissan selling Yokohama HQ
      Cesar Miguel . Today
    • Hyundai Motor PH turns over P386k, hygiene kits to Good Neighbors PH
      Hyundai Motor PH turns over P386k, hygiene kits to Good Neighbors PH
      Cesar Miguel . Today
    • BOC to auction luxury vehicles seized from Discayas
      BOC to auction luxury vehicles seized from Discayas
      Paulo Papa . Nov 06, 2025
    • Check out Subaru Forest e-Boxer Hybrid’s comfy, driver-centric interior
      Check out Subaru Forest e-Boxer Hybrid’s comfy, driver-centric interior
      Cesar Miguel . Nov 06, 2025
    • Jaecoo EJ6’s strengths, weaknesses
      Jaecoo EJ6’s strengths, weaknesses
      Cesar Miguel . Nov 06, 2025
    • Omoda E5: pros and cons
      Omoda E5: pros and cons
      Paulo Papa . Nov 05, 2025
    • Jaecoo J7 SHS: 4 reasons to buy
      Jaecoo J7 SHS: 4 reasons to buy
      Cesar Miguel . Nov 05, 2025
    • Honda City Hatchback: 4 reasons to buy
      Honda City Hatchback: 4 reasons to buy
      Cesar Miguel . Nov 03, 2025
    • Avoid road trip horror stories this 'Undas' with these tips
      Avoid road trip horror stories this 'Undas' with these tips
      Ruben Manahan IV . Oct 20, 2025
    • Here are ways to avoid road rage
      Here are ways to avoid road rage
      Paulo Papa . Sep 23, 2025
    • How well do you understand traffic signs?
      How well do you understand traffic signs?
      Cesar Miguel . Sep 09, 2025
    • How car collectors can take advantage of Liqui Moly products
      How car collectors can take advantage of Liqui Moly products
      Ruben Manahan IV . Sep 08, 2025
    • Do you still need to wash your car after it rains?
      Do you still need to wash your car after it rains?
      Cesar Miguel . Jun 12, 2025
    • First drive: Mercedes-Benz GLE 400e
      First drive: Mercedes-Benz GLE 400e
      Paulo Papa . Oct 29, 2025
    • Land Rover Defender Octa: down and dirty
      Land Rover Defender Octa: down and dirty
      Paulo Papa . Oct 28, 2025
    • Mitsubishi XForce: X marks the spot
      Mitsubishi XForce: X marks the spot
      Paulo Papa . Oct 27, 2025
    • First drive: Ford Territory Hybrid
      First drive: Ford Territory Hybrid
      Cesar Miguel . Oct 16, 2025
    • Honda HR-V S: well-endowed entry level option
      Honda HR-V S: well-endowed entry level option
      Cesar Miguel . Oct 06, 2025